Standard Accessories
- Flat steel bottom.
- 1:12 slope deck.
- 20-inch diameter center deck dome with free-flow screened ventilator.
- 24-inch square deck manway.
- One 24 x 46-inch flush cleanout for installation in first ring.
- Baked-on Trico-Bond epoxy coating on both sides of bottom and on tank interior. Exterior given one coat of epoxy primer with a finish coat of acrylic polyurethane.
- Galvanized bolts, nuts and washers furnished throughout.
- Steel recessed washer with neoprene ring furnished for interior bottom seams and exterior vertical seams.
- Gasket material.
- Caulking or sealant.
- Touch-up paint.
- Foundation anchor bolts when required.
- Erection drawings.
Optional Accessories
- Hot-dipped galvanized coating on all interior and exterior components with galvanized nuts, bolts, and washers furnished throughout.
- Galvanized outside ladder with safety cage, rest platform and anti-climb closure with hinge and locking hasp.
- Safety climb device for attachment to ladder.
- Inside wall-mounted ladder.
- Galvanized handrails and toeboard for deck perimeter on each side of ladder entry.
- Internal overflow nozzle weir box with external nozzle.
- Downcomer pipe with or without flap gate.
- Outlet nozzle.
- Drain nozzle.
- Suction nozzle with anti-vortex plate.
- Liquid level indicator with stainless steel float and target board.
- Set of foundation grade retainer bands.
- Polycapped bolts for interior shell and roof seams.
- Encapsulated nuts for bottom seams and/or deck connections.
- Z-Bond 493 (4-coat factory applied coating system)
|
 |
|
|
 |
 |